The Cover Up

The holidays were challenging because they fell on Tuesday and broke up two weeks. However, we did manage to get some things done. The furnaces were set and fired up.

The ceilings were all drywalled so we could install the attic insulation. We are using cellulose in the ceilings and that requires drywall to hold it in place (more on cellulose in a later post).

We also installed most of the beadboard lanai ceiling and trimmed the posts.