The Home Stretch

It’s been a couple weeks and we have made much progress. The fireplace hearth and surround – all carved limestone – has been installed!

Wood floors throughout the house are complete, the front door and transom window above have been set in place.

Our wood and glass garage doors have been installed

The lower level is totally caught up with upstairs so we can finish it out all together.

The finish (or trim) carpenters will arrive Monday to a house full of doors, cabinets and moldings to assemble and closet shelving to build.

You will see what looks like amazing progress in the coming weeks as it all comes together but, if you have followed us from the beginning you will recognize that the hard work was the planning required to allow us to make the finish happen smoothly. At least we hope that will be the case!